Sacred Heart College
This coastal college has opted to replace the fibre cement sheeting from the 2-story library building.
The conversion to colorbond sheeting went according to plan, with the end product and finish exceeding expectation. The Library is positioned in the middle of the school, surrounded by other building, access was very limited. The installation of a comprehensive scaffolding system to the entire perimeter made our job quicker and completely safe.
With the sea breeze coming in early most days, our work was limited to the first half of the day. With a 30-degree pitch roof, it is not easy to maneuver 12m sheets in high winds, despite the challenges, we have managed to complete ahead of schedule and to a high standard.